Our company promises that the provided goods should be in original factory packaging, which can prevent the goods from being damaged or bumped during transit. Such packaging should take necessary protective measures against moisture, sun, rust, corrosion, vibration and other damage, so as to protect the goods from being able to withstand multiple handlings, loading and unloading, and long-distance ocean and inland transportation.
Our company has signed long-term cooperation agreements with logistics companies such as SF Express and Debon Logistics, and uses the partners' freight systems to achieve on-time and safe arrival.
Product packaging, expressing
Before and after the construction of the project, our company will assign technical engineers to provide users with corresponding technical guidance to ensure the smooth implementation of the project. Technical guidance can be divided into two categories: pre-sales technical guidance and after-sales technical support.
On-site installation and testing : During the production stage, our company will formulate detailed installation, debugging and training plans based on the requirements of purchasers and users, and designate technical backbones and installation workers on standby. After confirming the delivery time, our company will make the installation, debugging and training plans The training plan is notified to purchasers and users, and the on-site preparation requirements for installation, commissioning and training are notified to purchasers and users in order to make on-site preparations. After the purchaser and user confirm that they have the installation and commissioning conditions, our company will assign our technical personnel to arrive at the site in time according to the cargo transportation cycle and the purchaser's requirements to complete our installation preparation work. Once the goods arrive at the site, they can be ready for installation. Debugging work.
During the installation period, our company will assign dedicated personnel to be stationed at the site to coordinate the work to ensure the smooth progress of the installation work, and will arrange technical backbones to direct the installation and construction on site.
On-site testing: Since the equipment supplied by the manufacturer has undergone strict quality inspection and performance testing before leaving the factory, unqualified products will never leave the factory, which provides a strong guarantee for later debugging work. All debugging work is carried out in strict accordance with the installation and operation manual, and will never leave any hidden dangers for the normal operation of the project.
During the installation and testing process, we will complete the installation work of this project with advanced technology and determine the quality and progress of the project according to the requirements of "quality first, ensuring progress".
In order to ensure the detection effect of the equipment and reduce the number of subsequent trips on the road, technicians tested the functions, response sensitivity, data return stability, detection accuracy and other performance of each instrument on site. Such as: road surface sprinkler test in the detection area, human interference visibility meter response sensitivity test and other confirmatory tests.
Project site installation and test